A1 road (Great Britain)
The A1 is the longest numbered road in the UK, at 410 miles (660 km). It connects London, the capital of England and the United Kingdom, with Edinburgh, the capital of Scotland. It passes through and near North London, Hatfield, Welwyn Garden City, Stevenage, Baldock, Letchworth Garden City, Huntingdon, Peterborough, Grantham, Newark-on-Trent, Retford, Doncaster, Leeds, Harrogate, York, Ripon, Darlington, Durham, Gateshead, Newcastle upon Tyne, Alnwick and Berwick-upon-Tweed.[2]
It was designated by the Ministry of Transport in 1921, and for much of its route it followed various branches of the Great North Road, the main deviation being between Boroughbridge and Darlington. The course of the A1 has changed where towns or villages have been bypassed, or where new alignments take a slightly different route. Several sections of the route have been upgraded to motorway standard and designated A1(M). Between the M25 (near London) and A696 (near Newcastle upon Tyne) the road is part of the unsigned Euroroute E15 from Inverness to Algeciras.
History
The A1 is the latest in a series of routes north from London to York and beyond. It was designated in 1921 by the Ministry of Transport under the Great Britain road numbering scheme.[3][4] The earliest documented northern routes are the roads created by the Romans during the period from AD 43 to AD 410, which consisted of several itinera (plural of iter) recorded in the Antonine Itinerary.[5] A combination of these were used by the Anglo-Saxons as the route from London to York, and together became known as Ermine Street.[6] Ermine Street later became known as the Old North Road.[7] Part of this route in London is followed by the current A10.[8] By the 12th century, because of flooding and damage by traffic, an alternative route out of London was found through Muswell Hill, and became part of the Great North Road.[7][8] A turnpike road, New North Road and Canonbury Road (A1200 road), was constructed in 1812 linking the start of the Old North Road around Shoreditch with the Great North Road at Highbury Corner.[9] While the route of the A1 outside London mainly follows the Great North Road route used by mail coaches between London and Edinburgh, within London the coaching route is only followed through Islington.[10]
The A1 route was modified in 1927 when bypasses were built around Barnet and Hatfield. In the 1930s bypasses were added around Chester-le-Street and Durham, and the Ferryhill Cut was dug. In 1960 Stamford, Biggleswade and Doncaster were bypassed, as were Retford in 1961 and St Neots in 1971. Baldock was bypassed in July 1967. During the early 1970s plans to widen the A1 along Archway Road in London were abandoned after considerable opposition and four public inquiries during which road protesters disrupted proceedings.[11] The scheme was finally dropped in 1990.[12] The Hatfield cut-and-cover was opened in 1986.[13]
A proposal to upgrade the whole of the A1 to motorway status was investigated by the Government in 1989[14] but was dropped in 1995, along with many other schemes, in response to road protests against other road schemes (including the Newbury Bypass and the M3 extension through Twyford Down).[15]
Service Stations
Moto
- Washington Northbound and Southbound
- Scotch Corner Southbound (Also Connected to A66)
- Wetherby Southbound
- Ferrybridge Northbound (Also Connected to M62)
- Blyth Southbound
- Grantham North
Extra
- Baldock
- Peterbrough
Roadchef
- Durham
Inns
The inns on the road, many of which still survive, were staging posts on the coach routes, providing accommodation, stabling for the horses and replacement mounts.[10] Few of the surviving coaching inns can be seen while driving on the A1, because the modern route now bypasses the towns with the inns.
Route
The A1 runs from New Change in the City of London at St. Paul's Cathedral to the centre of Edinburgh. The road skirts the remains of Sherwood Forest, and passes Catterick Garrison. It shares its London terminus with the A40, in the City area of Central London. It runs out of London through Islington (where Upper Street forms part of its route), up Holloway Road, through Highgate, Barnet, Potters Bar, Hatfield, Welwyn, Stevenage, Baldock, Biggleswade, Sandy and St Neots.
Continuing north, the A1 runs on modern bypasses around Stamford, Grantham, Newark-on-Trent, Retford, Bawtry, Doncaster, Knottingley, Garforth, Wetherby, Knaresborough, Boroughbridge, Scotch Corner, Darlington, Newton Aycliffe, Durham and Chester-le-Street, past the Angel of the North sculpture and the Metrocentre in Gateshead, through the western suburbs of Newcastle upon Tyne, Morpeth, Alnwick, Berwick-upon-Tweed, into Scotland at Marshall Meadows, past Haddington and Musselburgh before arriving in Edinburgh at the East End of Princes Street near Waverley Station, at the junction of the A7, A8 and A900 roads.
Scotch Corner, in North Yorkshire, marks the point where before the M6 was built the traffic for Glasgow and the west of Scotland diverged from that for Edinburgh. As well as a hotel there have been a variety of sites for the transport café, now subsumed as a motorway services.
Overview and post-First World War developments
Most of the English section of the A1 is a series of alternating sections of dual carriageway and motorway. From Newcastle upon Tyne to Edinburgh it is a trunk road with alternating sections of dual and single carriageway. The table below summaries the road as motorways and non-motorways sections,[16]
Road Name | Junctions | Length | Ceremonial counties/ Lieutenancies |
Primary destinations | |
---|---|---|---|---|---|
miles | km | ||||
A1 | 16.58 | 26.68 | London Hertfordshire |
London | |
A1(M) | 1–10 | 24.14 | 38.84 | Hertfordshire | Hertford Stevenage |
A1 | 26.25 | 42.24 | Hertfordshire, Bedfordshire Cambridgeshire |
Bedford Cambridge | |
A1(M) | 13–17 | 12.84 | 20.66 | Cambridgeshire | Peterborough |
A1 | 72.99 | 117.44 | Cambridgeshire, Rutland Lincolnshire, Nottinghamshire |
Stamford, Grantham Newark on Trent | |
A1(M) | 34–38 | 15.13 | 24.34 | South Yorkshire | Doncaster, Rotherham Barnsley |
A1 | 7.51 | 12.08 | South Yorkshire West Yorkshire |
Pontefract Wakefield | |
A1(M) | 40–51 | 51.14 | 82.29 | West Yorkshire North Yorkshire |
Selby. Leeds York,Wetherby |
A1 | 7.67 | 12.34 | North Yorkshire | Thirsk Scotch Corner | |
A1(M) | 56–65 | 34.46 | 55.45 | North Yorkshire, County Durham Northumberland |
Darlington, Bishop Auckland Teesside, Durham Sunderland |
A1 | 128.29 | 206.42 | Northumberland, Berwickshire East Lothian, Edinburgh |
Gateshead, Newcastle upon Tyne Morpeth, Alnwick Berwick-upon-Tweed, Haddington Edinburgh | |
Total | 397.00 | 638.78 |
A 13-mile (21 km) section of the road in North Yorkshire, from Walshford to Dishforth, was upgraded to motorway standard in 1995.[17] Neolithic remains and a Roman fort were discovered.
A 13-mile (21 km) section of the road from Alconbury to Peterborough was upgraded to motorway standard at a cost of £128 million (£203 million as of 2016),[18]which opened in 1998[19] requiring moving the memorial to Napoleonic prisoners buried at Norman Cross.[20]
A number of sections between Newcastle and Edinburgh were dualed between 1999 and 2004, including a 1.9-mile (3 km) section from Spott Wood to Oswald Dean in 1999, 1.2-mile (2 km) sections from Bowerhouse to Spott Road and from Howburn to Houndwood in 2002–2003 and the 8.5-mile (13.7 km) "A1 Expressway", from Haddington and Dunbar in 2004. The total cost of these works was some £50 million.[21]
Plans to dual the single carriageway section of road north of Newcastle upon Tyne were shelved in 2006 as they were not considered a regional priority by central government. The intention was to dual the road between Morpeth and Felton and between Adderstone and Belford.[22]
In 1999 a section of A1(M) between Bramham and Hook Moor opened to traffic along with the extension of the M1 from Leeds.[23] Under a DBFO contract,[24] sections from Wetherby to Walshford and Darrington to Hook Moor were opened in 2005 and 2006, taking the section to a junction.
Recent developments
A1 Peterborough to Blyth grade separated junctions
Between August 2006 and September 2009 six roundabouts on the A1 and the A1(M) to Alconbury were replaced with grade-separated junctions. These provide a fully grade-separated route between the Buckden roundabout (just north of St Neots and approximately 8 miles (13 km) north of the Black Cat Roundabout) and just north of Morpeth.[25] This project cost £96 million.[26]
Blyth (A614) | Fully operational May 2008 |
Apleyhead (A614/A57) | Fully operational January 2008 |
Markham Moor (A57) | Fully operational April 2009 |
Gonerby Moor (B1174) | Fully operational March 2008 |
Colsterworth (A151) and the junction with the B6403 | Fully operational September 2009 |
Carpenters Lodge (Stamford) (B1081) | Fully operational December 2008 |
A1(M) Bramham to Wetherby motorway
Upgrading the 6.2 miles (10 km) of road to dual three-lane motorway standard between the Bramham/A64 junction to north of Wetherby to meet the section of motorway at a cost of £70 million began in 2006, including a road alongside for non-motorway traffic. The scheme's public inquiry began on 18 October 2006 and the project was designed by James Poyner. Work began in May 2007, the motorway section opened in July 2009 and remaining work on side roads was still ongoing in late August and was expected to be completed by the end of 2009.[27]
A1(M) Dishforth to Leeming motorway
Upgrading of the existing dual carriageway to dual three-lane motorway standard, with a local road alongside for non-motorway traffic, between Dishforth (A1(M)/A168 junction) and Leeming Bar, began in March 2009 and opened to traffic on or about the scheduled date of 31 March 2012.[28]
Proposed developments
A1(M) Leeming to Barton motorway
It had originally been proposed that the road would be upgraded to motorway from Dishforth to Barton (between Scotch Corner and Darlington), which was the start of current northernmost section of A1(M). In 2010 the section between Leeming and Barton was cancelled as part of government spending cuts[29] but was reinstated in December 2012.[30] Work began on 3 April 2014 and is expected to be completed by Spring 2017. Once implemented, it will provide a continuous motorway-standard road between Darrington (south of M62 junction) and Washington, and will provide the North East and North Yorkshire with full motorway access to London (via the M1). Councils in the north east have called for the section from Hook Moor in Yorkshire (where the M1 link road joins the A1(M)) to Washington to be renamed as the M1. They maintain that the renaming will raise the profile of the north-east and be good for business.[31]
A1(M) Red House to Darrington motorway
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, planning will begin to upgrade the road in South Yorkshire to raise the last non-motorway section from Red House to Darrington to motorway standard.[32] Once completed, it will provide a continuous motorway standard road between Blyth, Nottinghamshire and Washington, Tyne and Wear and will provide the North East and Yorkshire with full motorway access to London via the M1, M62 and M18. It will also reduce congestion and improve safety along this route, as well as creating a new corridor to the North East, reducing congestion on the M1 around Sheffield and Leeds.
A1 (Gateshead)
In his Autumn Statement on 5 December 2012, the Chancellor of the Exchequer announced that the government would upgrade a section of road (from 2 to 3 lanes in each direction within the highway boundary[32]) at Lobley Hill (between Coal House and Metro Centre[32]), Gateshead at a cost of £64m[33] and create parallel link roads between the Lobley Hill and Gateshead Quay junctions.[32] In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, the remaining section of road between Birtley and Coal House will also be widened to provide dual 3 lanes, alongside the replacement of the Allerdene Bridge.[32]
A1 Scotswood to North Brunton
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, the road from Scotswood to North Brunton will be widened to allow dual 3 lane through the junctions with dual 4 lane between some junctions.[32]
A1 Morpeth to Ellingham
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, the road from Morpeth to Ellingham will be upgraded to dual carriageway.[32] The selection of the preferred route is scheduled for the year 2017.[34]
A1 north of Ellingham
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, measures will be implemented to enhance the performance and safety of the A1 north of Ellingham to include 3 sections of climbing lanes, 5 junctions with improved right turn refuges and better crossing facilities for pedestrians and cyclists.[32] Start of construction is scheduled for 2018.[34]
Ellington to Fen Ditton scheme
The planned A14 Ellington to Fen Ditton scheme would require a new junction at Brampton, north of which the A1 will be widened to a three-lane dual carriageway from Brampton to the Brampton Hut interchange. The new two-lane dual carriageway section of the A14 would run parallel with the A1 on this section.[35]
A428 scheme
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, the remaining single carriageway section of the A428 between Caxton Gibbet west of Cambridge and the A1 will be upgraded to dual carriageway, including a grade separated junction at the A1 Black Cat Roundabout.[36]
A46 Newark northern bypass scheme
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, planning will begin to upgrade the Newark northern bypass to dual carriageway, and the A46 junction with the A1 will be replaced to support nearby housing growth and improve links from the A1 to Newark and Lincoln.[37]
A1(M) Doncaster By-pass
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, the Doncaster By-pass which is the oldest stretch of 2 lane motorway still in service will be upgraded to dual 3 lanes. This will relieve local congestion and provide the capacity needed to make the A1 an alternative (and better) strategic route to the north east.[32]
Sandy-Beeston By-pass
Location | Bedfordshire |
---|---|
Proposer | Highways Agency |
Cost estimate | £67 million |
Start date | 2016 |
In 2003 a proposal for a bypass of Sandy and Beeston, Bedfordshire, was put forward as a green-lighted scheme as part of a government multi-modal study, with a cost of £67 million.[38] However, the Highways Agency was unwilling to confirm the information as the study was preliminary and intended for future publication.[39] In 2008 the proposal was submitted for consideration in the pre-2013/14 Regional Funding Advice 2 Programme of the East of England Development Agency.[40]
A1(M) technology enhancements and upgrades
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, new technology will be implemented to bring the road to motorway standards, including detection loops, CCTV cameras and variable message signs to provide better information for drivers and active traffic management across Tyne and Wear,[32] while Junction 6 (Welwyn north) to Junction 8 (Hitchin) will be upgraded to smart motorway, including widening of 2 lane section to dual 3 lane and hard shoulder running.[36]
A1 East of England feasibility study
In the ‘Road investment strategy’ announced to Parliament by the Department for Transport and Secretary of State for Transport on 1 December 2014, a strategic study will examine how to improve the safety and performance of the A1 between Peterborough and the M25, including whether to upgrade the old dual carriageway section to motorway standard.[36]
Other proposals
The Highways Agency has been investigating an upgrade of the A1 Newcastle/Gateshead Western Bypass to dual three-lane motorway standard to alleviate heavy congestion which in recent years has become a recurrent problem.[41]
Improvements to junctions near the village of Elkesley, Nottinghamshire are planned: the village's only access to the rest of the road network is via the A1.[42]
Consideration is being given to widening the Brampton Hut interchange to Alconbury sections to a three-lane dual carriageway.[35]
A1(M)
Some sections of the A1 have been upgraded to motorway standard. These are known as the A1(M) and are part of European route E15. These include:
- M25 to Stotfold
The M25 to Stotfold section is 23 miles (37 km), and was constructed between 1962 and 1986. The main destinations are Hatfield, Welwyn Garden City, Stevenage, and Letchworth. It opened in five stages: junctions 1 to 2 in 1979; 2 to 4 in 1986; 4 to 6 in 1973; 6 to 8 in 1962; and 8 to 10 in 1967.
- Alconbury to Peterborough
The Alconbury to Peterborough section is 14 miles (23 km), and opened in 1998.
- Doncaster By-pass
The Doncaster By-pass opened in 1961 and is one of the oldest sections of motorway in Britain.[43] It is 15 miles (24 km) long, and runs from Blyth to Carcroft.
- Darrington to Leeming
The Darrington to Leeming section was constructed between 1995 and 2012. It is 34 miles (55 km), and opened in sections:
- Walshford to 49 in 1995
- Junctions 43 to 44 in 1999
- When this section opened it ended at a temporary terminus south of the M1. There was a final exit into Micklefield Village for non-motorway traffic onto what is now the access road. During the first week of June 2009, Junctions 44 and 45 were renumbered 43 and 44. At the same time the A1/A659 Grange Moor junction became A1(M) Junction 45.[44] As a result many atlases show incorrect junction numbering for this stretch of motorway.
- Junction 46 to temporary junction at Walshford opened in 2005[45]
- Junction 40 to south of 43 opened in 2005 & 2006
- The northern section of the upgrade, bypassing Fairburn village opened in April 2005 with a temporary connection with the A1 between Fairburn and Brotherton. The southern section, with a free-flow interchange with the M62 motorway opened on 13 January 2006.
- Junctions 44 to 46 opened in 2009[46]
- Junctions 49 to 51 opened as of 31 March 2012. Work began in March 2009 to upgrade the Dishforth to Leeming section to dual three-lane motorway standard with existing connections being replaced by two new junctions.[47] This work was completed on 31 March 2012.
- Scotch Corner to Gateshead
The Scotch Corner to Gateshead section is 30 miles (48 km), and opened in stages:
- Junctions 56 to 59 in 1965
- Junctions 59 to 63 in 1969
- Junctions 63 to 65 in 1970
In popular culture
The A1 is celebrated in song. It is mentioned by Jethro Tull on the title track of the album Too Old to Rock 'n' Roll: Too Young to Die! "Up on the A1 by Scotch Corner". "Scotch Corner," by the Welsh band Man, on the album Rhinos, Winos and Lunatics is about an encounter there. Near the southern end, signs saying "Hatfield and the North" inspired the eponymous 1970s rock band Hatfield and the North. The A1 is mentioned in The Long Blondes' song, "Separated By Motorways", along with the A14. The A1(M) is mentioned in the song "Gabadon" by Sheffield band, Haze. Andrew Blackman's 2009 novel "On the Holloway Road", inspired by Jack Kerouac's On the Road, centres on a road trip along the A1.[48]
Junctions
A1 Road junctions - Central London to Barbican | |||||
Northbound exits (A carriageway) | Junction | Southbound exits (B carriageway) | |||
---|---|---|---|---|---|
A1 Road junctions - Barbican to South Mimms | |||||
Northbound exits (A carriageway) | Junction | Southbound exits (B carriageway) | |||
A1(M) Motorway junctions - South Mimms to Stotfold | |||||
Northbound exits (A carriageway) | Junction | Southbound exits (B carriageway) | |||
M25 - (M1),
(M3), (M11), (M4), (M40), (M23), (M20), Heathrow, Gatwick, Stansted |
J1
Services |
Road continues as A1 to London | |||
A1001 - Welham Green | J2 | No access | |||
A1001 - Hatfield | J3 | A1001 - Welham Green | |||
A414 - Hertford
A6129 - Welwyn Garden City |
J4 | A1001- Hatfield
A6129 - Welwyn Garden City | |||
Ramp on Only | J5 | No access | |||
A1000 - Welwyn | J6 | A1000 - Welwyn Garden City, Welwyn | |||
A602 - Stevenage | J7 | A602 - Stevenage, Ware | |||
A602 - Stevenage, Hitchin, Luton Airport | J8 | A602 - Stevenage, Hitchin, Luton Airport | |||
A505 - Letchworth, Baldock | J9 | A505 - Letchworth, Baldock | |||
A507 - Stotfold, Shefford, | J10
Services |
A507 - Stotfold, Baldock | |||
A1 Road junctions - Stotfold to Alconbury | |||||
Northbound exits (A carriageway) | Junction | Southbound exits (B carriageway) | |||
Langford, Edworth, Hinxworth | Langford Turn | Langford, Edworth, Ashwell, Hinxworth | |||
A6001 - Biggleswade | Biggleswade Roundabout | A6001 - Biggleswade | |||
A6001 - Biggleswade, Old Warden | Old Warden Roundabout | A6001 - Biggleswade, Old Warden | |||
A603 - Bedford
B1042 - Sandy |
Sandy Roundabout | A603 - Bedford
B1042 - Sandy | |||
Blunham | Blunham, Tempsford, Little Barford, Everton | ||||
A421 - Milton Keynes, Bedford, (M1) | Black Cat Roundabout | A421 - Milton Keynes, Bedford, (M1) | |||
A428 - Cambridge, St Neots, Eaton Socon | A428 - Cambridge, St Neots, Eaton Socon | ||||
B645 - Kimbolton
B1048 - St Neots |
B645 - St Neots | ||||
Little Paxton, St Neots | Little Paxton, St Neots | ||||
B661 - Kimbolton, Buckden | Buckden Roundabout | B661 - Kimbolton, Buckden | |||
Brampton, RAF Brampton | Brampton, RAF Brampton | ||||
A14 - THE MIDLANDS, Kettering, Corby, Huntingdon, (M1), (M6) | A14 Junction | A14 - THE MIDLANDS, Huntingdon, Harwich, Felixstowe, (M1), (M6) |
References
- ↑ 51°30′55″N 0°05′50″W / 51.5153°N 0.0972°W
- ↑ Roadlists
- ↑ Chris Marshall (2011). "CBRD » In Depth » Road Numbers » How it happened". cbrd.co.uk. Archived from the original on 24 July 2011. Retrieved 7 August 2011.
- ↑ "Memorandum on Route Numbering". The National Archives. 28 June 1922. Retrieved 4 December 2012.
- ↑ Thomas Codrington (1903). Roman Roads in Britain – Antonine Itinerary. roman-britain.org. Society for Promoting Christian Knowledge. Retrieved 23 August 2011.
- ↑ Thomas Codrington. "LacusCurtius • Codrington's Roman Roads in Britain — Chapter 4". penelope.uchicago.edu. Retrieved 23 August 2011.
- 1 2 Frank Goddard (2004). Great North Road. Frances Lincoln Ltd. p. 14. ISBN 978-0-7112-2446-9. Retrieved 23 August 2011.
- 1 2 Christopher Hibbert, Ben Weinreb (2009). The London Encyclopedia. Pan Macmillan. p. 343. ISBN 978-1-4050-4925-2. Retrieved 23 August 2011.
- ↑ Christopher Hibbert, Ben Weinreb (1983). The London Encyclopedia. Macmillan. p. 541. ISBN 978-0-333-32556-8. Retrieved 23 August 2011.
- 1 2 Norman W. Webster (1974) The Great North Road
- ↑ Adams, John (1981). Transport planning, vision and practice. ISBN 978-0-7100-0844-2.
- ↑ "Road Victories" (PDF). Road Block. Archived (PDF) from the original on 16 February 2008. Retrieved 22 January 2008.
- ↑ "A1(M) Hatfield Tunnel Refurbishment".
- ↑ "hansard millbanksystems written_answers/1989/jul/14/a1-motorway-status". Hansard. Retrieved 26 December 2015.
- ↑ "Column: 1180". Hansard. 20 December 1995. Retrieved 20 January 2008.
- ↑ The table was drawn up by reading values from the AA Route Planner for the journey Bank of England, London to Waverley Station, Edinburgh via Wittering. Adjustments were made for sections of the route that were not part of the A1."Route planner". AA. Archived from the original on 31 January 2011. Retrieved 15 January 2011.
- ↑ "A1(M). Walshford to Dishforth". Retrieved 20 February 2010.
- ↑ UK CPI inflation numbers based on data available from Gregory Clark (2016), "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)" MeasuringWorth.
- ↑ "A1(M) Alconbury to Peterborough". Highways Agency.
- ↑ "Norman Cross Eagle Appeal". Local Heritage Initiative. Archived from the original on 9 February 2008. Retrieved 22 January 2008.
- ↑ "A1 expressway opened".
- ↑ "Northumberland Today – A1 dualling hopes dashed". Northumberland Today. 13 July 2006. Retrieved 20 January 2008.
- ↑ CBRD » Photo Gallery » Spontaneous Motorway
- ↑ "Darrington to Dishforth". Highways Agency. p. 1. Retrieved 20 February 2010.
- ↑ "A1 Peterborough to Blyth Grade Separated Junctions Scheme". Highways Agency. Retrieved 20 January 2008.
- ↑ "Bigger and bigger pricetag".
- ↑ "A1(M) Bramham to Wetherby Improvement Scheme". Highways Agency. Archived from the original on 18 January 2008. Retrieved 20 January 2008.
- ↑ "A1(M) upgrade in North Yorkshire nears completion – even more motorway for road users". Highways Agency. Archived from the original on 9 February 2008. Retrieved 21 March 2012.
- ↑ "Details emerge of dumped road schemes". Construction Enquirer. Retrieved 6 January 2011.
- ↑ Autumn Statement 2012 (PDF). Her Majesty's Stationery Office. 5 December 2012. ISBN 978-0-10-184802-2. Retrieved 5 December 2012.
- ↑ Kearney, Tony (4 December 2015). "Civil engineers back call to rename A1(M)". The Northern Echo. Retrieved 26 December 2015.
- 1 2 3 4 5 6 7 8 9 10 "Road investment strategy: north east and Yorkshire, 1 December 2014".
- ↑ "Autumn Statement: A1 to be upgraded to motorway status". BBC.
- 1 2 "Highways England Delivery Plan 2015-2020" (PDF). Retrieved 5 August 2015.
- 1 2 "A14 Ellington to Fen Ditton Scheme". Highways Agency. Archived from the original on 31 January 2008. Retrieved 20 January 2008.
- 1 2 3 "Road investment strategy: East of England, 1 December 2014".
- ↑ "Road investment strategy: Midlands, 1 December 2014".
- ↑ "List of schemes announced". The Daily Telegraph. 9 July 2003. Retrieved 2 July 2009.
- ↑ "Route of Proposed Sandy/Beeston Bypass" (PDF). Highways Agency. Retrieved 2 July 2009.
- ↑ "Regional Funding Advice – Transport Update" (PDF). East of England Development Agency. 11 December 2008. Retrieved 2 July 2009.
- ↑ Highways Agency – A1 Western By-pass
- ↑ Highways Agency – A1 Elkesley Junctions Improvement
- ↑ "The Motorway Archive. Oldest, widest, longest, highest.". ciht.org.uk. 2008. Retrieved 28 July 2011.
- ↑ "A1(M) Bramham to Wetherby". Highways Authority. Archived from the original on 27 June 2010. Retrieved 17 July 2010.
- ↑ "A1(M) Wetherby to Walshford". Highways Agency. Archived from the original on 30 August 2008. Retrieved 6 August 2008.
- ↑ "A1(M) Bramham to Wetherby". Highways Agency. Archived from the original on 20 August 2008. Retrieved 6 August 2008.
- ↑ "A1 Dishforth to Leeming Improvement Scheme (A1 Dishforth to Barton)". Highways Agency. Archived from the original on 1 July 2010. Retrieved 17 July 2010.
- ↑ "On the Holloway Road by Andrew Blackman"
External links
Wikimedia Commons has media related to A1 road (Great Britain). |