Bamford railway station

Bamford National Rail
Location
Place Bamford
Local authority High Peak
Coordinates 53°20′20″N 1°41′20″W / 53.3389°N 1.6890°W / 53.3389; -1.6890Coordinates: 53°20′20″N 1°41′20″W / 53.3389°N 1.6890°W / 53.3389; -1.6890
Grid reference SK208825
Operations
Station code BAM
Managed by Northern
Number of platforms 2
DfT category F2
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2010/11 Increase 25,656
2011/12 Decrease 25,050
2012/13 Increase 27,044
2013/14 Increase 27,774
2014/15 Increase 28,628
History
Original company Dore and Chinley Railway
Pre-grouping Midland Railway
Post-grouping London, Midland and Scottish Railway
25 June 1894 (1894-06-25) Station opened
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Bamford from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Bamford railway station serves the village of Bamford in the Derbyshire Peak District, in England and is managed by Northern.

History

The view in 1966.

Bamford station was built by the Dore and Chinley Railway, a company which was absorbed by the Midland Railway prior to opening. The line was opened for goods traffic on 6 November 1893, and for passenger trains on 1 June 1894, but Bamford station was not opened until 25 June that year.[1][2] The Dore and Chinley line later became known as the Hope Valley Line. The station became an unstaffed halt in 1969 when the last station master purchased the Station House. The main station building was located on the road overbridge, and was removed during the late 1970s.

Derwent Branchline

During the construction of the nearby Derwent and Howden dams between 1912 and 1916, the railway carried stone from a quarry at nearby Grindleford, up a branchline to the worksite. When the dams were completed, the branchline was removed, but later re-instated in 1945 during the construction of the Ladybower Reservoir. A signalbox used to control the station and branchline, but this has since been relocated to Peak Rail. The branchline has since been removed, but there is access to the old trackbed as the Thornhill Trail.

Service

All services are provided by Northernl except the first (to Manchester) and the last (to Nottingham) which are provided by East Midlands Trains.

Trains from Sheffield take around 22 minutes, and trains from Machester Picadilly take around 53 minutes.

Weekdays

Weekends

References

  1. Awdry, Christopher (1990). Encyclopaedia of British Railway Companies. London: Guild Publishing. p. 71. CN 8983.
  2. Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 26. ISBN 1-85260-508-1. R508.
  3. Northern Rail timetable 23 Manchester to Sheffield, 13 December 2015 - 14 May 2016Northern Rail; Retrieved 31 March 2016

External links

Wikimedia Commons has media related to Bamford railway station.
Preceding station   National Rail   Following station
Northern
Hope Valley Line
East Midlands Trains
Limited service


This article is issued from Wikipedia - version of the 11/24/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.