Batu Caves Komuter station
KC05 Batu Caves 黑风洞 باتو كيۏس | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Batu Caves, Gombak, Selangor, Malaysia. | ||||||||||
Coordinates | 3°14′16.1″N 101°40′52.2″E / 3.237806°N 101.681167°E | ||||||||||
Owned by | Keretapi Tanah Melayu | ||||||||||
Line(s) | KTM Port Klang Line (KTM Komuter) | ||||||||||
Platforms | Side | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Parking | Available, Free | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | KC05 | ||||||||||
History | |||||||||||
Opened | 1905 | ||||||||||
Rebuilt | April 2010 | ||||||||||
Electrified | April 2010 | ||||||||||
Services | |||||||||||
|
Batu Caves Komuter station (formerly Batu Caves railway station) is a Malaysian commuter railway station at Batu Caves, Gombak District, Selangor, Malaysia. After redevelopment, the station was reopened in August 2010 is now a terminus for the Batu Caves-Port Klang Route on the KTM Komuter passenger network.
History
The Batu Caves railway station was constructed on 1 November 1905. Over the years, the station fell into a poor condition through neglect and lack of use. The line between Sentul and Batu Caves was not included in the double-tracking and electrification of the line between Kuala Lumpur and Sentul under the Sixth Malaysia Plan (1990-1995). Since then, the station has been rebuilt and the line electrified. The existing single railway track between Sentul to Batu Caves was doubled, and new stations and halts built, including Taman Wahyu, Kampung Batu, and Batu Kentonmen. This project was scheduled to start before 2001, with DRB-Hicom Berhad as a contractor. The letter of intent was issued by the Transport Ministry to the company on 13 April 2001.[1] However, no letter of award was issued and there was no progress until 17 November 2006 when site possession was given to contractor YTL Corporation. The project was expected to be completed by April 2010.[2] and new station opened in August 2010.
Around the station
See also
References
- ↑ "Bursa Malaysia reply to query on article entitled: "DRB-HICOM, Emrail on track for more jobs"". Malaysian Stock Exchange. 15 August 2002.
- ↑ "Landasan Berkembar Elektrik Sentul-Batu Caves (Sentul-Batu Caves double tracking and electrification)" (in Malay). KTMB. n.d. Archived from the original on 27 September 2007. Retrieved 14 June 2007.
Wikimedia Commons has media related to Batu Caves Railway Station. |
Coordinates: 3°14′16″N 101°40′52″E / 3.23778°N 101.68111°E