Cerro Prieto Geothermal Power Station

Cerro Prieto Geothermal Power Station
Location of Cerro Prieto Geothermal Power Station in Mexico
Country Mexico
Location South Mexicali, Baja California
Coordinates 32°24′43″N 115°14′41″W / 32.41194°N 115.24472°W / 32.41194; -115.24472Coordinates: 32°24′43″N 115°14′41″W / 32.41194°N 115.24472°W / 32.41194; -115.24472
Status Operational
Commission date 1973
Power generation
Units operational CP1: 4 × 37.5MW, 1 × 30MW
CP2: 2 × 110MW
CP3: 2 × 110MW
CP4: 4 × 25MW
CP5: 2 × 50MW
Nameplate capacity 720 MW

The Cerro Prieto Geothermal Power Station is the largest complex of geothermal power stations by size not by output , with an installed capacity of 720 MW (this is not up to date according to the List of largest power stations in the world, with plans for expansion up to 820 MW by 2012.[1][2] The facility is located in south Mexicali, Baja California, in Mexico, and is built in five individual units, namely CP1, CP2, CP3, CP4 and CP5.

Stations

Cerro Prieto I

The CP1 powerhouse (32°24′43″N 115°14′41″W / 32.41194°N 115.24472°W / 32.41194; -115.24472 (Cerro Prieto I)) has a total installed capacity of 180 MW,[3] generated by four units of 37.5 MW and one unit of 30 MW. Units 1 and 2 of this powerhouse was commissioned between 1973, followed by 3 and 4 in 1981.[4]

Cerro Prieto II

The CP2 powerhouse (32°23′27″N 115°13′33″W / 32.39083°N 115.22583°W / 32.39083; -115.22583 (Cerro Prieto II)) has a total installed capacity of 220 MW,[3] generated by two 110 MW units which were commissioned in 1982.[4]

Cerro Prieto III

The CP3 powerhouse (32°23′52″N 115°14′18″W / 32.39778°N 115.23833°W / 32.39778; -115.23833 (Cerro Prieto III)) has a total installed capacity of 220 MW,[3] generated by two identical units as CP2, measuring 110 MW. This powerhouse was commissioned in 1983, a year after the commissioning of CP2.[4]

Cerro Prieto IV

The CP4 station (32°24′15″N 115°12′43″W / 32.40417°N 115.21194°W / 32.40417; -115.21194 (Cerro Prieto IV)) commenced operations in July 2000, and consists of four turbines, each with a capacity of 25 MW.[2][3][4][5]

Cerro Prieto V

The CP5 station (32°24′54″N 115°15′08″W / 32.415041°N 115.252108°W / 32.415041; -115.252108 (Cerro Prieto V)) is the newest powerhouse of the Cerro Prieto station. It was proposed in July 2009, with the commencement of constructions in September 2009. CP5 will consist of two 50 MW units, increasing the total capacity of the Cerro Prieto Geothermal Power Station by 100 MW.[1][6]