Dahuashui Dam
Dahuashui Dam | |
---|---|
Location of Dahuashui Dam in China | |
Country | China |
Location | Kaiyang County of Guizhou Province |
Coordinates | 26°49′26″N 107°15′54″E / 26.82389°N 107.26500°ECoordinates: 26°49′26″N 107°15′54″E / 26.82389°N 107.26500°E |
Construction began | December 2003 |
Opening date | 2008 |
Dam and spillways | |
Impounds | Qingshui River |
Height | 134.5 m (441 ft) |
Length | 287.6 m (944 ft) |
Width (base) | 28 m (92 ft) |
Reservoir | |
Creates | Dahuashui Reservoir |
Total capacity | 276,500,000 m3 (224,162 acre·ft) |
Surface area | 7.6 km2 (3 sq mi) |
Power station | |
Commission date | January 2008 |
Hydraulic head | 127.7 m (419 ft) (min.) |
Installed capacity | 200 MW |
Annual generation | 775 GWh |
The Dahuashui Dam is an arch dam on the Qingshuihe River near Pingzhai in Kaiyang County of Guizhou Province, China. The purpose of the dam is hydroelectric power production and flood control. The dam creates a reservoir of 276,500,000 m3 (224,162 acre·ft) which supplies water to a power station containing two 200 MW generators. Construction on the dam began in December 2003 and was expected to be complete in May 2007 but a lack of funding delayed project completion until initial operation on January 20, 2008. The dam was constructed with roller-compacted concrete.[1][2][3]
See also
References
- ↑ "Dahuashui Hydropower Project" (PDF). Chinese National Committee on Large Dams. Retrieved 8 January 2011.
- ↑ "CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Dahuahshui Project" (PDF). United Nations. Retrieved 8 January 2011.
- ↑ "IHA Sustainability Protocol Audit Assessment of Dahuashui Hydropower Project" (PDF). Norwegian Government Purchases. Retrieved 8 January 2011.
This article is issued from Wikipedia - version of the 6/23/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.