GO 59 Floating dock

History
Italy
Name: GO 59
Builder: Cantiere Navale Giacalone di Mazara del Vallo (Trapani)
Laid down: 2013
Launched: 2014
Acquired: 2011 for Euro 7 millions.[1]
Commissioned: march 2014
In service: 1
Homeport: Brindisi[2]
General characteristics
Type: Floating dry dock
Length: 70.00 m (229 ft 8 in) oa[3]
Beam: 19.0 m (62 ft 4 in) beam overall
Draught: 8.0 m (26 ft 3 in) (max)
Draft: 9.5 m (31 ft 2 in) (max)
Propulsion:
  • none
  • 1 x diesel generator
Notes: lifting capability, 1,000 tonnes

GO 59 is a Floating dry dock of the Marina Militare.[4]

History

Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7]
These are the technical specifications of MM for its realization.

References

This article is issued from Wikipedia - version of the 12/4/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.