Miaowei Dam

Miaowei Dam
Location of Miaowei Dam in China
Country China
Location Yunlong County, Dali Bai Autonomous Prefecture, Yunnan
Coordinates 25°51′15.66″N 99°9′40.78″E / 25.8543500°N 99.1613278°E / 25.8543500; 99.1613278Coordinates: 25°51′15.66″N 99°9′40.78″E / 25.8543500°N 99.1613278°E / 25.8543500; 99.1613278
Purpose Power
Status Under construction
Construction began 2010
Opening date 2016 (est.)
Dam and spillways
Type of dam Embankment, rock-fill
Impounds Lancang (Mekong) River
Height 139.8 m (459 ft)
Reservoir
Total capacity 660,000,000 m3 (540,000 acre·ft)
Catchment area 93,900 km2 (36,300 sq mi)
Power station
Commission date 2016-2017 (est.)
Type Conventional
Turbines 4 x 350 MW Francis-type
Installed capacity 1,400 MW

The Miaowei Dam is a rock-filled embankment dam currently under construction on the Lancang (Mekong) River in Yunlong County of Yunnan Province, China. Construction on the dam began in 2010 and its 1,400 MW hydroelectric power station is expected to be operational in 2016.[1][2]

See also

References

  1. "Introduction of Miao tail power plant construction (苗尾电站建设情况简介)" (in Chinese). Chinese Communist Yunlong County. 1 September 2013. Retrieved 16 June 2014.
  2. "Yunnan Lancang River Hydropower Miao tail excitation system equipment tenders" (in Chinese). China Huaneng Group. 20 January 2014. Retrieved 17 June 2014.
This article is issued from Wikipedia - version of the 1/7/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.