Newcastle and North Shields Railway

Newcastle and North Shields Railway

Ouseburn Bridge, near Newcastle, built by the Newcastle and North Shields Railway in the 1830s using laminated timber arches on masonry piers, similar to the Wiebeking system used in Paris
Dates of operation 18391844
Successor Newcastle & Berwick Railway
Track gauge 4 ft 8 12 in (1,435 mm)

The Newcastle & North Shields Railway opened in June 1839 from a temporary terminus in Carliol Square in Newcastle upon Tyne to North Shields. The railway was absorbed by the Newcastle & Berwick Railway in November 1844. The Newcastle & Berwick Railway was itself absorbed by the York, Newcastle & Berwick Railway, and this became part of the North Eastern Railway in 1854.

Tynemouth was served from 1847 and Newcastle Central replaced the original station in 1850. In 1882 the station at Tynemouth was replaced by a through station when the line and the former Blyth & Tyne Railway line were linked. The route was electrified in 1904 as part of the Tyneside Electrics programme.

Origins

A railway between Newcastle and North Shields was proposed in 1830, but was opposed in Newcastle by people who feared that the city docks would lose trade to docks at North Shields and in North Shields by people who feared local shops would lose trade when customers could travel to Newcastle and that no-one would holiday in North Shields if they could stay in Newcastle. Of the two proposed routes one was chosen in 1835, changed the following year so Tynemouth was on the main line rather than served by a branch. To compensate landowners for the lost income from wayleaves on coal carried on the existing wagonways, a toll of 34d[lower-alpha 1] a mile was agreed. The Newcastle and North Shields Railway (N&NSR) received Royal Assent on 21 June 1836.[2]

1834 Plan Newcastle to North Shields Railway etched by W Collard

After leaving the temporary terminus at Newcastle the railway passed through short tunnel before crossing two viaducts built using laminated timber arches on masonry piers, similar to the Wiebeking system used on the Seine at Pont d'Ivry in Paris. The 918-foot (280 m) long Ouseburn Viaduct was built with three arches whereas the Willington Dene Viaduct was 1,048 feet (319 m) long and had seven arches. The railway opened on 18 June 1839 when two trains carried a total of 700 passengers on a return trip to a celebration in Tynemouth, which was interrupted by a violent thunderstorm that flooded the marquee. Public services started the next day, although Tynemouth was not served until 1847.[3]

The average speed of express trains in 1841 was 31–34 miles per hour (50–55 km/h).[4] Third-class carriages were painted light green, and the first was 20 feet 8 inches (6.30 m) long and 7 feet 9 inches (2.36 m) wide, did not have doors and carried 60 passengers. First class carriages were painted crimson, maroon, and in one case a rich light scarlet claret edged with yellow and second-class passengers were light brown and vermilion.[5] The railway was absorbed by the Newcastle & Berwick Railway in November 1844, although independent operations continued until a 14 12-mile (23.3 km) line north to Morpeth opened on 1 July 1847 from a junction from Heaton.[6]

Legacy

Newcastle & North Shields Railway

Legend
Blyth & Tyne Railway
towards Whitley Bay
Tynemouth
Tynemouth
closed 1882
North Shields
Percy Main

Percy Main Junction
Howdon
Willington Quay
closed 1973
Howdon Viaduct
Point Pleasant
closed 1973
Wallsend
Carville
closed 1973
Walkergate
Walker
closed 1973
Tyne and Wear Metro
towards St James

St Anthonys
closed 1960
East Coast Main Line
towards Morpeth
St Peters
closed 1973
Heaton
closed 1980
Byker
closed 1954
Riverside Junction
Blyth & Tyne Railway
towards Jesmond
Manors
Carliol Square
closed 1850

Durham Coast Line
towards Sunderland
Newcastle Central
East Coast Main Line
towards Durham

The Newcastle & Berwick Railway was absorbed by the York, Newcastle & Berwick Railway, and this became part of the North Eastern Railway in 1854.[7] The temporary terminus in Newcastle was replaced by Newcastle Central station in 1850.[8] A 10 km (6 mi) loop via Walker, known as the Riverside Branch, was opened in 1879[9] and a through station (now Tynemouth Metro station) replaced the original N&NSR terminus, linking with the Blyth & Tyne Railway, in 1882.[10] The line was electrified as part of the Tyneside Electrics programme, the new trains running in passenger service from 1904.[11]

The line today

Services were withdrawn from the Riverside branch on 23 July 1973[12] and it now has been converted into a footpath and cycle-path known as Hadrian's Way, forming part of both the C2C cycle route (National Cycle Network route 72) and the Hadrian's Wall National Trail.

In 1982 almost all of the main route (from a point just east of Heaton to Tynemouth and beyond) was converted to form part of the Tyne and Wear Metro Yellow line.

Notes and references

Footnotes

  1. A pre-decimal penny was worth in 1836 about the same as 35p in 2015.[1]

References

  1. UK CPI inflation numbers based on data available from Gregory Clark (2016), "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)" MeasuringWorth.
  2. Allen 1974, p. 81.
  3. Allen 1974, p. 82.
  4. Tomlinson 1915, p. 396.
  5. Tomlinson 1915, pp. 401, 403.
  6. Allen 1974, pp. 83–86.
  7. Allen 1974, pp. 83, 107.
  8. Hoole 1974, p. 204.
  9. Allen 1974, p. 115.
  10. Hoole 1974, p. 208.
  11. Hoole 1974, p. 213.
  12. http://www.disused-stations.org.uk/s/st.peters/

Sources

Further reading

Wikimedia Commons has media related to Newcastle and North Shields Railway.

March 1843 timetable from Bradshaw's Railway Monthly (XVI) (text) (scan)

This article is issued from Wikipedia - version of the 8/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.