S2 (Rhine-Main S-Bahn)

S2

Overview
Type Rapid transit, Commuter rail
System S-Bahn Rhein-Main
Status Operational
Locale Frankfurt Rhine-Main
Termini Niedernhausen
Dietzenbach
Stations 27
Services Main-Lahn Railway, Citytunnel Frankfurt, Rodgau Railway, Offenbach-Bieber–Dietzenbach railway
Line number 2
Operation
Opened 28 May 1978 (1978-05-28)
Owner Rhein-Main-Verkehrsverbund
Operator(s) DB Regio
Depot(s) Frankfurt Hbf
Rolling stock DBAG Class 423
Technical
Line length 54.7 km (34.0 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification Overhead line
Route number 645.2

The S2 service of the S-Bahn Rhein-Main system bearing the KBS (German scheduled railway route) number 645.2 is a railway connection between the small Taunus town Niedernhausen and Dietzenbach.

Usually DBAG Class 423 railcars are used on this service. Its predecessor class 420 is only used for shortened shuttle services.

Routes

Main-Lahn railway

Main article: Main-Lahn Railway

The service uses the tracks of the Main-Lahn Railway between Niedernhausen and Frankfurt Central Station. This route is also used by regional trains in the section Niedernhausen–Frankfurt-Höchst. Between Frankfurt-Höchst and Central Station this service shares the Main-Lahn line with freight and shunting operations. National and regional services use the parallel running Taunus railway in this section. The Main-Lahn railway was completed on 15 October 1877 and has been used by S-Bahn services since 1978.

City tunnel

Main article: Citytunnel Frankfurt

The city tunnel is an underground, pure S-Bahn route used by almost all services (except for the S7 service which terminates at the central station). The tunnel was opened in four stages in 1978, 1983, 1990 and 1992. In a short section between Mühlberg and Offenbach-Kaiserlei the South Main railway is used. The section from Mühlberg to Offenbach Ost through the Offenbach City Tunnel was opened in 1995.

Rodgau railway

Main article: Rodgau Railway

This line was opened in 1896 and has been used since 2003 only by S-Bahn services.

Offenbach-Bieber–Dietzenbach railway

This line was opened on 1 December 1898 and has been used since 2003 only by S-Bahn services.

History

Year Stations Route
1974 (R2) 11 Niedernhausen – Frankfurt Hbf
1978 13 (+2) Niedernhausen – Hauptwache
1983 14 (+1) Niedernhausen – Konstablerwache
1990 17 (+3) Niedernhausen – Frankfurt Süd
1992 16 (+1, -2) Niedernhausen – Mühlberg
1995 17 (+2, -1) Niedernhausen – Frankfurt Süd
2002 18 (+1) Niedernhausen – Frankfurt Süd
2003 26 (+10, -2) Niedernhausen – Dietzenbach
2007 27 (+1) Niedernhausen – Dietzenbach

The S2 was one of the first six services of the Rhine-Main S-Bahn system. In a prior test operation it ran between Niedernhausen and Frankfurt Central Station. The service was then called R2 where the letter "R" stands for regional. In 1975 the R2 was the system's first service employing the class 420 trainset. After the opening of the Frankfurt Citytunnel the service was renamed to S2 and extended to the new Hauptwache underground station. Further extensions of the tunnel followed in 1983 (Konstablerwache) and 1990 (Ostendstraße and Lokalbahnhof) so that the Südbahnhof (South station) became the service's eastern terminal. After the opening of the eastern Citytunnel branch to the Mühlberg station in 1992 the S2 started operation in this section shutting down its service to Lokalbahnhof and Südbahnhof until in 1995 the service resumed its pre-1992 operation. In 2002, Eppstein-Bremthal station was completed increasing the number of stations to 18.

In 2003 the Offenbach Citytunnel and the Rodgau railway was included. After two years of construction work this route was changed to S-Bahn operation. Since then the new eastern terminal station is Dietzenbach. In 2007 the new Frankfurt-Zeilsheim station was included to the S2 service.

Operation

  1. Niedernhausen – Dietzenbach
  2. Niedernhausen – Offenbach Ost
  3. Niedernhausen – Frankfurt Hbf
  4. Hofheim – Frankfurt Hbf
  5. Griesheim – Dietzenbach
  6. Offenbach Ost – Dietzenbach
End of the line at Niedernhausen
Crossing the valley at Eppstein
Journey time Station Transfer S-Bahn service
since
1 2 3 4 5 6
0 Niedernhausen 1978
3 +3 Eppstein-Niederjosbach 1978
5 +2 Eppstein-Bremthal 2002
7 +2 Eppstein 1978
12 +5 Hofheim-Lorsbach 1978
15 +3 Hofheim 1978
18 +3 Kriftel 1978
20 +2 Frankfurt-Zeilsheim 2007
23 +3 Farbwerke 1978
26 +3 Frankfurt-Höchst 1978
28 +2 Frankfurt-Nied 1978
31 +3 Frankfurt-Griesheim 1978
37 +6 Frankfurt Hbf 1978
36 +5 Frankfurt Hbf (tief) 1978
38 +2 Taunusanlage 1978
40 +2 Hauptwache 1978
42 +2 Konstablerwache 1983
43 +1 Ostendstraße 1990
45 +2 Mühlberg 1992
48 +3 Offenbach-Kaiserlei 1995
50 +2 Ledermuseum 1995
52 +2 Marktplatz 1995
55 +3 Offenbach Ost 1995
57 +3 Offenbach-Bieber 2003
61 +4 Heusenstamm 2003
64 +3 Dietzenbach-Steinberg 2003
66 +2 Dietzenbach-Mitte 2003
68 +2 Dietzenbach 2003
Wikimedia Commons has media related to S2 (S-Bahn Rhein-Main).
This article is issued from Wikipedia - version of the 10/24/2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.