Selby railway station

This article is about the railway station in England. For the Puffing Billy Railway station near Melbourne, Australia, see Selby railway station, Melbourne.
Selby National Rail

Selby station from the south, 2011
Location
Place Selby
Local authority Selby
Coordinates 53°46′59″N 1°03′48″W / 53.783000°N 1.063440°W / 53.783000; -1.063440Coordinates: 53°46′59″N 1°03′48″W / 53.783000°N 1.063440°W / 53.783000; -1.063440
Grid reference SE618322
Operations
Station code SBY
Managed by TransPennine Express
Number of platforms 3
DfT category E
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2010/11 Increase 0.481 million
2011/12 Increase 0.485 million
2012/13 Increase 0.496 million
2013/14 Increase 0.533 million
2014/15 Increase 0.550 million
History
Key dates Opened 1834 (1834)
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Selby from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Selby railway station serves the town of Selby in North Yorkshire, England. The original terminus station was opened in 1834 for the Leeds and Selby Railway. The Hull and Selby Railway extended the line in 1840, and a new station was built, with the old station becoming a goods shed. The station was rebuilt in 1873 and 1891, the 1891 rebuilding being required due to the replacement of the swing bridge over the Ouse at the same time.

The area around the station has been the location for the junctions of a number of lines, including the former East Coast Main Line route between Doncaster and York, as well as the Selby to Driffield Line (1848), and the Selby to Goole Line (1910). After 1983 with the opening of the Selby Diversion Selby is no longer on the East Coast Main Line.

As of 2014 lines lead from Selby to Leeds, Hull and Doncaster. The station is managed by TransPennine Express, and receives regional trains operated by Northern and TransPennine Express, as well as Hull-London services operated by Hull Trains and Virgin Trains East Coast.

History

1834 station

Original Leeds and Selby station, now warehousing (2013)

In 1834 the Leeds and Selby Railway opened, running east west from a terminus station in Marsh Lane, Leeds to a terminus at Selby.

The line opened 22 September 1834, with only one track complete.[1] A train from Leeds set off a 6 am and arrived in Selby around 9 am, to a general celebration. When general service started the journey took about 65 minutes.[2] The main stations were not completed until a few months after the line opened; the Selby terminus at a cost of £10,300. Both tracks of the line were completed by 15 December 1834.[3]

The basic design of the station was of a large warehouse shed, 245 feet (75 m) long and 96 feet (29 m) wide on a site of around 3 acres (1.2 ha), with a wooden trussed roof of three spans (of approximately 25', 46', and 25') supported via iron brackets on 19.5 feet (5.9 m) cast iron columns, which were hollow and acted as drainpipes, to collect rain water then stored in underground tanks. Station offices and other buildings were built adjoining the station. The train shed had six lines of track, four for freight and two for passengers.[4][5][6] Lines for coal and lime were separate, outside the shed to the east, the offices at the northwest corner. The line of rails continued through the station to a wharf on the River Ouse.[7][8] Journeys to Hull were completed by Packet boat from Selby.[1]

After construction of the new station in 1840, with the connection on the Hull and Selby Railway old station became a goods station.[9]

The rail links to the old station were removed in the 1980s. As of 2009 the station is used as warehousing by Viking Shipping Services Ltd.[10]

1840 station

In 1840, the Hull and Selby Railway was opened.[11] To cross the River Ouse, a bascule lifting bridge was installed, northwest of the old station.[n 1] At that time ships had priority over railway traffic.[12]

The Hull and Selby, and Leeds and Selby railways connected 'end on' at Selby, west of the old station; the Leeds and Selby Line diverged from its old terminus path at a junction near the crossing of Park street; the line of the railway ran a short distance west, and parallel to the track in the original station.[13] A new through station was built, and the old station became a goods station.[9]

1873 station

In 1871 the NER opened two new sections of track, from Shaftholme junction (4 miles north of Doncaster) to Selby Old West junction (Selby), and from Barlby junction (across the Ouse from Selby) to Chandler's Whin junction (Dringhouses, York); these formed a new route for the East Coast Main Line.[14]

A new station was constructed from between 1870 and 1873, built by Thomas Nelson to a design from Thomas Prosser's office in the NER.[15]

1891 station

North end of Selby station and the swing bridge (1957)

In 1891 a new swing bridge was built downstream (east) of the original over the Ouse (see 1891 Selby swing bridge). The priority of river traffic over rail traffic was reversed on completion of the new bridge; crossings by rail were more than ten times more numerous than river craft.[16]

As a consequence of the shift in the path of the railway the old station was rebuilt. The down (west) platforms were retained and modified, whilst the up (east) platforms were moved eastwards, re-using and extending Prosser's platform roof. The architect for the remodelling and extension was the NER's William Bell.[17]

History of rail transport at Selby

In addition to the main lines west to Leeds (Leeds & Selby, 1834), east to Hull (Hull & Selby, 1840), and north and south to York and Doncaster (York & Doncaster branch, 1871), the rail system at Selby was the location for a number of junctions to other lines, and other facilities.

A branch from the Hull line (near Barlby to Market Weighton) opened in 1848.[18] (see Selby and Market Weighton Railway) The line ran from Cliffe junction east of the Ouse south of Barlby, around a mile east of Selby.[19]

The Cawood, Wistow and Selby Light Railway (CW&SLR) was opened in 1898 linking the Leeds & Selby Railway to the village of Cawood. Until 1904 the line had a separate station, Brayton Gates, 1 mile west of Selby. The line was predominantly used for agricultural traffic but also carried passengers until 1930, its final closure taking place in 1960.

The Selby to Goole Line opened in 1910, ran via the villages of Barlow, Drax and Rawcliffe to Goole. The line closed in 1964 as a result of the Beeching report. A short section of the line was used to access a ballast tip near Barlow until 1983.

In the mid 20th century the 'Loop Line' was converted into a triangle junction by the addition of a short chord between the Selby-Doncaster and Selby-Leeds lines.[20]

In 1983 the Selby Diversion of the East Coast Main Line was opened, avoiding the area around Selby due to possible subsidence from the drift mining works of the Selby Coalfield. As a result, Selby ceased to be a through route on the ECML. The 1871 line from Selby to York was closed on 24 May 1983 and in 1989 was converted into a cycle track which now forms part of route 65 of the National Cycle Network. The line south to Temple Hirst Junction was retained - it is in regular use for both passenger & freight traffic and also serves as a diversionary route for Doncaster to Hull services if the line via Goole is closed for any reason.

Engine sheds and industrial branches

An engine shed was built 1870–2, in the V of the junction between the lines to Doncaster and Leeds. The shed was a standard NER design roundhouse by Prosser in a square overall shed, with 20 tracks. The shed was extended to a similar extent in 1896–8 with an adjacent square shed to a design by Bell.[21][22] In around 1900 a short "Loop Line" was built south of the station, altering the path to the Leeds line by forming a junction on the Doncaster line further south, beyond the engine sheds. The original route out of Selby to Leeds became peripheral, part of the sidings associated with the engine sheds.[22]

There was also a Canal works (dye and leather chemicals) east of the Doncaster line,[n 2] on the banks of the Selby Canal, connected by sidings from the mid 20th century.[25] Also on the Selby side of the Ouse were sidings for the gas works, and for a wood yard,[26] and for the 'Ousegate Maltings' as well as accommodation sidings for the Goods shed.[27]

Barlby signal box with BOCM mill in background (2007)

On the far bank of the Ouse there were industrial sidings: A seed mill north of the line had been established by in 1909 with a rail connection; this developed in to a large mill Olympia Mills, later part Jurgens (1919),[n 3] Unilever (1929), and BOCM (1952).[28][29] (now part of BOCM Pauls, not rail connected).

Also on the far bank a Sugar Beet factory, was rail connected from the south side Hull-Selby line from the mid 20th century.[25] In 1983 the site was acquired by logistics company Potter Group,[30] and redeveloped into a 62 acres (25 ha) distribution centre including a rail freight terminal and warehousing.[31][32] Client occupiers include Cemex (Asphalt concrete, using stone from Peak Forest, Derbyshire),[33][34] and Clipper Logistics (e-commerce clothing/textile logistics).[35][36]

Current services

Selby station (2006)

To Hull – Monday to Saturdays there are generally two trains per hour to Hull. An hourly TransPennine Express service and either a train from York or a Hull Trains service from London Kings Cross.

To York – there is generally an hourly service daily north to York. Some services start/ terminate here, others run to and from Hull.[37]

To Leeds – Monday to Saturdays there are two trains per hour to Leeds.[38][39] One Northern stopping service that starts here (usually continuing westwards to Bradford Interchange, Halifax and Huddersfield) and one TransPennine Express service to Manchester Piccadilly. Evenings and Sundays there is either an hourly or two-hourly First TransPennine Express service to Leeds and Manchester. One service each weekday (and Saturday) morning continues to Manchester Airport.

To London – there are eight trains per day in total via Doncaster to London King's Cross. All London services are operated by Hull Trains except the Hull Executive, which is run by Virgin Trains East Coast.

Northern also run two trains to/from Doncaster (one in the early morning and one in the evening – the latter pair through from Sheffield). Virgin Trains East Coast also runs an evening service between Hull and Doncaster (calling at Selby).[40]

Northern plan to introduce improved service levels. The current Leeds to Selby stopping service will be extended through to Bridlington via Hull and the York - Hull line service will become hourly throughout the week (including Sundays).[41]

Preceding station National Rail Following station
Doncaster or
London Kings Cross
  Virgin Trains East Coast
East Coast Main Line/York-Doncaster branch – Hull and Selby Line
  Brough
Doncaster   Hull Trains
East Coast Main Line/ York-Doncaster branch – Hull and Selby Line
  Howden
TransPennine Express
Northern
Northern
Northern
Northern
York and Doncaster branch
Disused railways
Temple Hirst   York and Doncaster branch (ECML, Old route)   Riccall
Terminus   CW&SLtR   Brayton Gates
Terminus   Selby to Goole Line   Barlow
Terminus   Selby to Driffield Line   Cliff Common

Trivia

In 2009 Selby celebrated the 175th anniversary of the opening of the first Selby station.[42]

The station is mentioned in the song "Slow Train" by Flanders and Swann.

Notes

  1. For details of the 1834 Ouse railway bridge at Selby see Selby swing bridge (1840)
  2. Former Liqourice factory, acquired by Yorkshire Dyeware and Chemical Company in 1912.[23] Disconnected from the rail network c.1970s (OS map 1866, 1982). Closed by Clariant 2008.[24]
  3. See also Antoon Jurgens, Antonius Johannes Jurgens and Margarine Unie.

References

  1. 1 2 Tomlinson 1915, pp. 256–257.
  2. Parsons 1835, pp. 77–78.
  3. Tomlinson 1915, pp. 259–260.
  4. Tomlinson 1915, p. 259.
  5. Parsons 1835, pp. 82–83.
  6. Brees, First series, Plate 62.
  7. Brees, 4th series, Plate 48, legend pp.cii-cii.
  8. Tomlinson 1915, p. 254, 258, 260.
  9. 1 2 Hoole 1986, pp. 29–30.
  10. Yorkshire's First Railway Station 2009, pp. 14–15.
  11. Tomlinson 1915, p. 337-338.
  12. Triffitt 1897, p. 207.
  13. Ordnance Survey. Town plans 1:1056 1848
  14. Tomlinson 1915, p. 3, 644.
  15. Fawcett 2003, p.35; Chap.3, n.31, p.128.
  16. Triffitt 1897, pp. 207–8.
  17. Fawcett 2003, p.35, Colour Plate 4, p.34.
  18. Tomlinson 1915, p. 491.
  19. Ordnance Survey| Sheet 221 1845-7; 221NE 1889–90
  20. Ordnance Survey. Sheet 221SE 1938, 1950
  21. Fawcett 2003, p.102; Fig.7.8, p.103.
  22. 1 2 Ordnance Survey. Sheet 221SE 1888–90, 1905
  23. Whitworth, Isabella (September 2008). "An Archive and Beyond" (PDF). Journal for Weavers, Spinners and Dyers. 227: 7.
  24. "Jobs axed in factory closure plan". BBC News. 7 November 2007.
  25. 1 2 Ordnance Survey. Sheet 221SE 1950
  26. Selby's Hidden Heritage 2011, p.1, col.1, "Firstly: The Overall View".
  27. Selby's Hidden Heritage 2011, p.1, col.3, "Looking at things in more detail".
  28. Ordnance Survey Sheet 221NE 1889–90, 1905, 1938, 1950
  29. Brace, Harold W. (1960), History of Seed Crushing in Great Britain, p. 154
  30. "Company History", www.potterlogistics.co.uk, retrieved 17 July 2014
  31. Godfrey, Ron (6 June 2009), "Potter Group's freight project receives green honours", York Press
  32. "Selby Distribution Centre", www.potterlogistics.co.uk, retrieved 17 July 2014
  33. Turley Associates (1 September 2011), The Potter Group – Selby Core Strategy Examination in Public (PDF), Selby Council, §1.2–1.7, p.1
  34. "CEMEX UK renews 25-year bulk contract with The Potter Group", www.multimodal.org.uk, 18 February 2010
  35. "Clipper on track for expansion", www.thebusinessdesk.com, 27 February 2009
  36. Perry, Dominic (11 March 2009), "Potter adds Clipper Group as tenant for Selby site", www.commercialmotor.com
  37. Northern Rail Timetable 34 York to Selby and Hull and York to Sheffield via Pontefract Baghill 13 December 2015 to 14 May 2016Northern Rail; Retrieved 31 March 2016
  38. Northern Rail Timetable 35, York & Selby to Leeds (PDF), Northern Rail, 13 December 2015 – 14 May 2016
  39. GB eNRT 2015-16 Edition, Table 39 (Network Rail)
  40. Triple Swoop for Virgin Trains
  41. Northern Franchise Improvements - DfT' Department for Transport'
  42. "Selby celebrates 175th anniversary of the opening of railway station". York Press. Newsquest Media Group. 21 September 2009.

Sources

External links

Wikimedia Commons has media related to Selby railway station.
Wikimedia Commons has media related to Rail transport in Selby.
This article is issued from Wikipedia - version of the 10/19/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.