Statpipe

Statpipe
Location
Country Norway
General direction north–south
From Statfjord and Heimdal fields
Passes through North Sea, Kårstø, Draupner S riser platform
To Ekofisk oil field (connected to Norpipe)
General information
Type natural gas
Owner Gassled
Operator Gassco
Technical service provider Statoil
Commissioned 1985
Technical information
Length 890 km (550 mi)
Maximum discharge 18.9 billion cubic meters per year
Diameter 30 in (762 mm)

The Statpipe pipeline is a natural gas system, which links northern North Sea gas fields with the Norway's gas export system. It transports gas from Statfjord, Gullfaks, Heimdal, Veslefrikk, Snorre, Brage, Tordis and Statfjord gas fields.

History

The Statpipe was developed by Statoil. The development plan was approved by the Norwegian Parliament (Storting) on 10 June 1981. The rich gas pipeline from Statfjord became operational on 25 March 1985 and the dry gas pipeline from Kårstø to Ekofisk field came on stream on 15 October 1985.[1] The Draupner S riser platform was installed in 1984 as part of the Statpipe system. In 1998, the Statpipe was connected directly with the Norpipe. On 1 January 2003, the Statpipe was merged into Gassled partnership and Gassco became the operator of the pipeline.[2]

Technical features

The total length of the Statpipe system is 890 kilometres (550 mi). It consists of both rich and dry gas pipelines. The 308-kilometre (191 mi) long rich gas pipeline runs from Statfjord field to the Kårstø gas processing plant. It has branch lines from Snorre and Gulfaks fields. The internal diameter of this pipe is 30 inches (760 mm) and capacity is 9.7 billion cubic metre (bcm) of natural gas per year.

The first leg of the dry gas pipeline runs from Kårstø to the Draupner S riser platform in the North Sea. The length of this line is 228 kilometres (142 mi). The internal diameter of the pipe is 28 inches (710 mm) and capacity is 7.6 bcm of natural gas per year. The second leg runs for 155 kilometres (96 mi) from the Heimdal platform in the North Sea to Draupner S. The diameter of this pipe is 36 inches (910 mm) and capacity 11 bcm per year. The Draupner S riser platform ties the Statpipe lines from Heimdal and Kårstø together for onward transmission to Ekofisk. The internal diameter of this section is 36 inches (910 mm), and it runs for 213 kilometres (132 mi) further south, where a 15.8-kilometre (9.8 mi) bypass around Ekofisk complex takes the Statpipe directly into Norpipe.

Ownership

The pipeline is owned by Gassled, operated by Gassco, and the technical service provider is Statoil.[1][3]

References

  1. 1 2 "Statpipe Gas Celebrates 20 Years in Operation". Statoil. Rigzone. 2005-10-17. Retrieved 2009-11-15.
  2. "GasLed leads way". Upstream Online. NHST Media Group. 2002-12-20. Retrieved 2009-11-15.
  3. "Pipe peace in Norway". Upstream Online. NHST Media Group. 2002-05-03. Retrieved 2009-11-15.
This article is issued from Wikipedia - version of the 2/18/2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.