USNS Burlington (T-EPF-10)
Artist's conception of Expeditionary Fast Transport | |
History | |
---|---|
U.S. | |
Name: | USNS Burlington |
Operator: | Military Sealift Command |
Awarded: | 20 December 2012[1] |
Builder: | Austal USA[1] |
Status: | Under construction |
General characteristics | |
Class and type: | Spearhead class expeditionary fast transport |
Length: | 103.0 m (337 ft 11 in) |
Beam: | 28.5 m (93 ft 6 in) |
Draft: | 3.83 m (12 ft 7 in) |
Propulsion: |
|
Speed: | 43 knots (80 km/h; 49 mph) |
Troops: | 312 |
Crew: | Capacity of 41, 22 in normal service |
Aviation facilities: | Landing pad for medium helicopter |
USNS Burlington (T-EPF-10) will be the tenth Spearhead-class expeditionary fast transport, to be operated by the Military Sealift Command.[1] It will be the first ship in naval service named after Burlington, Vermont’s largest city.[2]
Burlington is under construction in Mobile, Alabama by Austal USA.[3]
References
- 1 2 3 "Burlington". Naval Vessel Register. Retrieved 25 August 2016.
- ↑ "Navy Names Multiple Ships" (Press release). U.S. Department of Defense. 6 June 2013. Retrieved 24 June 2015.
- ↑ "Austal Awarded new A$434 Million US Navy Contract" (Press release). Austal. 16 September 2016.
This article is issued from Wikipedia - version of the 9/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.