USS Michael Monsoor
Christening of Michael Monsoor on 18 June 2016 | |
History | |
---|---|
United States | |
Name: | USS Michael Monsoor |
Namesake: | Michael A. Monsoor |
Awarded: | 14 February 2008 |
Builder: | Bath Iron Works |
Cost: | US$1.4 billion |
Laid down: | 23 May 2013[1] |
Launched: | 21 June 2016 |
Christened: | 18 June 2016 |
Commissioned: | 2016 (planned)[1] |
Motto: | "You Never Quiiiiiiiiiiit" |
Nickname(s): | 'The Quiter' |
Status: | Completed. Undergoing sea trials as of June 2016. |
General characteristics | |
Class and type: | Zumwalt-class destroyer |
Displacement: | 14,564 tons[2] |
Length: | 600 ft (182.9 m) |
Beam: | 80.7 ft (24.6 m) |
Draft: | 27.6 ft (8.4 m) |
Propulsion: | 2 Rolls-Royce Marine Trent-30 Gas turbine plus 2 Rolls-Royce RR4500 gas turbine generator sets,[3] 78 MW |
Speed: | 30.3 knots (56.1 km/h; 34.9 mph) |
Complement: | 140 |
Sensors and processing systems: |
|
Armament: |
|
Aircraft carried: |
|
Aviation facilities: | Hangar Bay, Helicopter Pad |
USS Michael Monsoor (DDG-1001) is the second ship of the Zumwalt class of guided missile destroyers. Michael Monsoor is a multi-mission surface combatant tailored for advanced land attack and littoral dominance. The ship's mission is to provide credible, independent forward presence and deterrence and to operate as an integral part of naval, joint or combined maritime forces.
Michael Monsoor is the second Zumwalt-class destroyer. The ship will be 600 feet (180 m) in length, have a beam of 80.7 feet (24.6 m) and displace approximately 15,000 tons. Michael Monsoor will have a crew size of 148 officers and sailors; she will make speed in excess of 30 knots (56 km/h; 35 mph).
Etymology
Michael Monsoor is named after Master-at-Arms Second Class Michael A. Monsoor (1981–2006), a United States Navy SEAL killed during the Iraq War and posthumously awarded the Medal of Honor.[4]
Construction
Assembly of modules for Michael Monsoor began in March 2010.[5] The keel laying and authentication ceremony for Michael Monsoor was held at the General Dynamics-Bath Iron Works shipyard on 23 May 2013.[6] Michael Monsoor was launched on 21 June 2016 and is now being fitted out.[7]
References
- 1 2 "NNS130523-14, Future USS Michael Monsoor (DDG 1001) Keel Authenticated". NAVSEA Office of Corporate Communications. 23 May 2013.
- ↑ "DDG 1000 Flight I Design". Northrop Grumman Ship Systems. 2007.
- ↑ "RR4500 ship service generator". Rolls-Royce. Retrieved 2014-07-09.
- ↑ "Michael A. Monsoor". militarytimes.com. Military Times. Retrieved 24 December 2010.
- ↑ "Flash Traffic: Keel Laid for 1st DDG-1000 Destroyer". The Navy. Navy Leage of Australia. 74 (1): 15. January 2012. ISSN 1322-6231.
- ↑ NAVSEA Office of Corporate Communications. "Future USS Michael Monsoor (DDG 1001) Keel Authenticated". Navy.mil. Retrieved 2014-07-09.
- ↑ "Navy Christens DDG-1001, Named For SEAL Michael Monsoor". U.S. Naval Institute. 20 June 2016.
- This article includes information collected from the Naval Vessel Register, which, as a U.S. government publication, is in the public domain. The entry can be found here.