Uintah Railway

Uintah Railway
Locale Book Cliffs - Uintah Basin
Dates of operation 19041939
Track gauge 3 ft (914 mm)
Headquarters Mack, Colorado

The Uintah Railway was a small 3 ft (914 mm) narrow gauge railroad company in Utah and Colorado in the United States. It was constructed to carry Gilsonite which provided most of its operating revenues; but it operated as a common carrier from 1904 to 1939, also carrying passengers, mail, express, and other cargoes including sheep and wool. When a public library was built in Dragon in 1910, the Uintah Railway agreed to deliver library books free of charge to and from any borrower along its route. Many area ranchers and miners took advantage of the opportunity.[1]

Background

The Uintah Basin includes seams of asphaltum remaining where petroleum from the Green River Formation oil shales seeped into fissures in the overlying sandstone where smaller hydrocarbon molecules were slowly evaporated or digested by aerobic microbes. The remaining large-molecular-weight hydrocarbons formed a lustrous black solid at ambient temperatures, resembling anthracite coal with a brownish dust. Following ignition, the heat generated by combustion causes the burning asphaltum to melt and flow. European Americans began mining this asphaltum in the 1860s, but attempts to burn it in conventional coal stoves were unsuccessful. The asphaltum was named Gilsonite after Samuel Henry Gilson began using the material in 1886 as a varnish and as electrical insulation. Gilson built a manufacturing plant in Salt Lake City, and began mining operations in 1888. The plant was purchased by a group of Missouri businessmen who formed the Gilsonite Asphaltum Company. For more than a decade, Gilsonite was hauled from the mines in horse-drawn wagons to be loaded aboard railway cars at Price, Utah. The wagons took ten or eleven days to make a round trip, and the hauling costs encouraged construction of a railroad.[2]

History

The railway company was founded in 1903 as a wholly owned subsidiary of the Gilson Asphaltum Company. Construction began at a connection with the Denver and Rio Grande Western Railroad at what became known as Mack, Colorado. Twenty-eight miles of track was laid following West Salt Wash Creek upstream to the company town of Atchee, Colorado, named after a chief of the Ute people. Atchee served as a division point with maintenance shops for railway equipment. From Atchee, six miles of 7.5 percent grade were required to climb the Book Cliffs to Baxter Pass at an elevation of 8,437 feet (2,572 m). From the summit of Baxter Pass, there were seven miles of 5 percent downhill grade to Wendella, Colorado, followed by twelve miles of 3 percent or shallower grades down Evacuation Creek to the Black Dragon Mine just west of the Utah border. The Black Dragon Vein of Gilsonite was exposed across the ground surface for a distance of 4 miles (6.4 km), and averaged 6 feet (1.8 m) wide for half of that distance. Trains began hauling Gilsonite from the Black Dragon Mine in October, 1904. Shay locomotives pulled freight trains over Baxter Pass between the Dragon Mine and Atchee, and 2-8-0 engines pulled the freight trains between Atchee and Mack.[3]

Ten miles of track were laid in 1911 on a one percent grade down Evacuation Creek from Dragon, Utah, to the Rainbow Mine near Watson, Utah. A new 2-8-2 locomotive was built to pull freight trains between Watson and Wendella. The new locomotive was more efficient than Shay locomotives on that section of track, but it could not negotiate the steep grades and sharp curves over Baxter Pass between Wendella and Atchee.[4] The railroad had operated passenger trains since 1905 consisting of a 0-6-2 tank locomotive pulling a single combine car between Mack and Dragon or Watson. This passenger train service was discontinued in 1921.[5]

For much of the 1920s the Uintah was headed by Lucian Sprague, a railroad executive who later became well known for orchestrating the dramatic turnaround of the bankrupt Minneapolis and St. Louis Railway.[6] In 1926 the railroad purchased an articulated locomotive, #50, which was specifically designed to handle the extreme curvature and steep grades of Baxter Pass. The idea was that this new locomotive would do away with the need to change engines at Atchee and Wendella. The single articulated locomotive could move as many cars as two Shay locomotives from Rainbow to Atchee, and made the trip in half the time. After some initial modifications, this engine proved to be such a success that in 1928 the railroad purchased a sister locomotive, #51. These were the only narrow gauge simple articulated locomotives sold for use in the United States.[7]

The railroad lasted until 1939 when trucks took over hauling the Gilsonite. At that time, the rails were pulled up and the towns abandoned. Most of the railway's locomotives were scrapped immediately; the two famous articulateds were sold to the Sumpter Valley Railway in Oregon, and later went to Guatemala, where they were dismantled. Today all that remains of the Uintah are the cellar pits of some of the buildings, the shell of the machine shop in Atchee, a few pieces of rolling stock, and part of the company hotel in Mack.[8]

Route

Locomotives

Number Builder Type Date Works number Notes[9]
1 Lima Locomotive Works 2-truck Shay locomotive 5/1904 888 scrapped 1928
2 Lima Locomotive Works 2-truck Shay locomotive 10/1904 939 scrapped about 1935
3 Lima Locomotive Works 2-truck Shay locomotive 4/1905 1513 scrapped 1933
4 Lima Locomotive Works 2-truck Shay locomotive 11/1905 1575 built as Waldorf Mining & Milling #2, then Argentine Central Railway #2, purchased in 1910; scrapped 1928
5 Lima Locomotive Works 2-truck Shay locomotive 6/1906 1674 formerly Argentine Central Railway #3, purchased 1910, reboilered 1930, scrapped 1939
6 Lima Locomotive Works 2-truck Shay locomotive 2/1920 3054 sold 1927 to Feather River Lumber Company #3
7 Uintah Railway Atchee shops 2-truck Shay locomotive 12/1933 assembled from spare parts from #1, #3, & #4 with new Lima boiler; scrapped 1939
10 Baldwin Locomotive Works 2-8-0 5/1904 24271 sold 1927 to Eureka Nevada Railway 2nd #10
1st #11 Baldwin Locomotive Works 2-8-0 3/1880 5011 built as Denver and Rio Grande #55; purchased 5/1904; scrapped 1911
2nd #11 Baldwin Locomotive Works 2-8-0 2/1911 36093 scrapped 1927
12 Baldwin Locomotive Works 2-8-0 3/1896 14771 built as Florence and Cripple Creek Railroad #10; then Cripple Creek and Colorado #36; purchased 8/1917; reboilered 1924; sold 1937 to Eureka Nevada Railway 2nd #12
20 Baldwin Locomotive Works 0-6-2 Tank locomotive 6/1905 25896 scrapped 1939
21 Baldwin Locomotive Works 0-6-2 Tank locomotive 7/1905 25953 scrapped 1939
30 Baldwin Locomotive Works 2-8-2 9/1911 36908 scrapped 1939
40 Baldwin Locomotive Works 2-8-2 9/1913 40953 built as New York and Bermudez Railroad #10; purchased 6/1919; scrapped 1939
50 Baldwin Locomotive Works 2-6-6-2 Tank locomotive 6/1926 59261 sold 1940 to Sumpter Valley Railway #250
51 Baldwin Locomotive Works 2-6-6-2 Tank locomotive 4/1928 60470 sold 1940 to Sumpter Valley Railway #251

Bibliography

Notes

  1. Bender, pp.85&87
  2. Bender, pp.13-19
  3. Bender, pp.20-51&239
  4. Bender, pp.95-111
  5. Bender. p.133
  6. Bender, pp.141&165
  7. Bender, pp.153-163
  8. Bender, pp.179-198
  9. Bender, pp.213&214
This article is issued from Wikipedia - version of the 11/3/2015. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.