Evka 3 (İzmir Metro)
Evka 3 | |
---|---|
Coordinates | 38°27′54″N 27°13′42″E / 38.46500°N 27.22833°ECoordinates: 38°27′54″N 27°13′42″E / 38.46500°N 27.22833°E |
Owned by | İzmir Metro |
Line(s) | Üçyol-Bornova |
Platforms | 2 side platforms |
Tracks | 2 |
Construction | |
Structure type | Underground |
Disabled access | Yes |
History | |
Opened | 30 March 2012 |
Electrified | 750 V DC Third Rail |
Evka 3 is a station on the currently operating line of the Izmir Metro system. Opened on 30 March 2012 it is the current eastern terminus of the line. It is located between Istanbul Avenue and Genghis Khan Street and offers connections to ESHOT city buses via a small bus hub adjacent to the station. An extension into Bornova's center is planned and construction is expected to begin in 2015.
This article is issued from Wikipedia - version of the 8/3/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.