First Capital Connect
| |||||
Overview | |||||
---|---|---|---|---|---|
Franchise(s): |
Thameslink Great Northern 1 Apr 2006 – 13 Sep 2014 | ||||
Main region(s): | East of England, London, South East England | ||||
Stations called at: | approx. 129 | ||||
Stations operated: | 77 | ||||
Route km operated: | 778.9 | ||||
National Rail abbreviation: | FC | ||||
Parent company: | FirstGroup | ||||
Website: | www.firstcapitalconnect.co.uk | ||||
|
First Capital Connect[1] (FCC) was a British train operating company, owned by FirstGroup, that operated the Thameslink Great Northern franchise from April 2006 to September 2014.
First Capital Connect was a major provider of commuter and regional services in London and the south east of England. It operated passenger rail services from Luton and Bedford via the Thameslink route to Sutton, Wimbledon and Brighton via Central London.
It also operated commuter, suburban and regional services out of London King's Cross and London Moorgate to Hertfordshire, Cambridgeshire and Norfolk. Major destinations served included Cambridge, King's Lynn and Peterborough.
First Capital Connect ceased operations at 02:00 on 14 September 2014, when the franchise was taken over by Govia Thameslink Railway, branded as Thameslink and Great Northern.
History
On 8 April 2005, the Strategic Rail Authority announced Danish State Railways/EWS, FirstGroup, John Laing/MTR, National Express and Stagecoach had been shortlisted for the Thameslink Great Northern franchise.[2] On 13 December 2005, the Department for Transport awarded the new franchise to FirstGroup with the services operated by Thameslink and West Anglia Great Northern transferring to First Capital Connect on 1 April 2006.[3]
The term of the franchise was originally for nine years, finishing in 2015. This was dependent on performance targets being met at the end of the fourth year, which would trigger an automatic two-year extension, and an extension for up to three years after the sixth year at the discretion of the DfT.[4] It was announced on 5 August 2011 that the franchise would end on 14 September 2013. "This will help to facilitate the continued project delivery of the Thameslink Programme, in particular the introduction of new rolling stock, which will be completed after the expiry date of the existing franchise."[5]
The Thameslink franchise and the Great Northern part of the West Anglia Great Northern franchise were amalgamated in preparation for the Thameslink Programme (formerly Thameslink 2000), which will increase capacity on the Thameslink route, with trains from King's Lynn, Cambridge and Peterborough.[6] On 24 July 2007 the government announced that it was fully committed to funding the Thameslink Programme,[7] and the project is now well under way.
In the early part of 2007, First Capital Connect conducted a study and undertook consultation on options for increasing the capacity of services to Peterborough and Cambridge. The final recommendations involved lengthening four peak services from eight to 12 carriages from May 2009, and adding or removing a small number of stops to balance loads between trains.[8][9] 1,779 more seats have been provided during the morning peak and 2,490 during the evening peak, significantly reducing the number of rush-hour commuters unable to find a seat.
Demise
In December 2011, the DfT announced that all services operated by First Capital Connect would be included within the new Thameslink Southern & Great Northern franchise.[10]
On 29 March 2012, the Department for Transport announced that Abellio, FirstGroup, Govia, MTR and Stagecoach had been shortlisted for the new franchise.[11][12]
The Invitation to Tender was to have been issued in October 2012, with the successful bidder announced in early 2013. However, in the wake of the InterCity West Coast re-franchising process collapsing, the government announced in October 2012 that the process would be put on hold pending the results of a review.[13]
In January 2013, the government announced it would be exercising an option to extend the franchise until 31 March 2014.[14]
In March 2013, the Secretary of State for Transport announced plans for a direct award franchise which would run until 13 September 2014.[15] On 18 February 2014, the Department for Transport announced it had agreed a new short-term franchise with First Capital Connect, running for six months to September 2014.[16]
On 23 May 2014, the new TSGN franchise was awarded to Govia with services operated by First Capital Connect transferring to Govia Thameslink Railway on 14 September 2014.[17]
Routes
The routes operated by First Capital Connect off-peak Monday to Friday were, with frequencies in trains per hour:
Great Northern
From London King's Cross
- to Peterborough – 2 (1 semi-fast, 1 stopping)
- to Cambridge (non-stop) – 2 (1 extended to King's Lynn)
- to Cambridge – 2 (1 semi-fast, 3 stopping)
From London Moorgate
- to Hertford North via Gordon Hill – 3 (1 extended to Letchworth Garden City)
- to Welwyn Garden City – 3
Unlike the Thameslink route, there was only one control centre for FCC services on the Great Northern route, at King's Cross, within the power signal box.
Thameslink
- Sevenoaks via Catford to Kentish Town (off-peak) or Bedford (peak trains)– 2 (jointly operated with Southeastern)
- Bedford to Brighton– 4 (2 semi-fast, 2 stopping)
- Luton to Sutton (London) via Wimbledon– 2
- St Albans to Sutton (London) via Mitcham Junction– 2
This gave a frequency of 10 trains between London Blackfriars and St Pancras. During the peaks this increases.
FCC had two control centres (or 'Service Delivery Centres', SDC) for the Thameslink route. North of Blackfriars was controlled from West Hampstead, within the power signal box; south of Blackfriars from Three Bridges, which was also home to other southern TOC controls.
Major service disruptions
The disruptions were triggered by FCC drivers declining to work overtime or during their allotted rest days, following their rejection of a proposed pay increase of 0% (rising to 3% in 2010). Without access to overtime and rest day work, FCC was unable to provide enough drivers to maintain its standard Thameslink service.[18] Disruption continued into January 2010 as a result of heavy snow in south-east England; although snow was not the only problem, and although significant snowfall ended on 6 January, FCC continued to run emergency timetables through to 11 January.[19]
Trains returned to the normal timetables from 18 January,[20] but delays and cancellations continued as a result of signalling problems. It was revealed that First Capital Connect achieved 60% in its punctuality during the first half of January 2010 on the Thameslink route. First Capital Connect has since offered improved discount and refund packages for customers affected by the disruption.[21]
On 23 December 2010 FCC introduced an emergency timetable on the Great Northern route, reducing the number of rush-hour trains by 75%. This was due to snow which had damaged some of the trains, making them unable to run.
Customer satisfaction
Angry commuters started a petition on the Prime Minister's website to end First Capital Connect's franchise during 2009.[22] Other people have asked for a full enquiry into the service, while Lord Adonis, the former Secretary of State for Transport, described the service offered by FCC on its Thameslink route as "shoddy" and "very substandard", and said that if improvements were not made the company could be stripped of its franchise.[23][24]
In its Autumn 2009 National Passenger Survey, Passenger Focus said FCC had the lowest overall satisfaction rating of any UK train operator, at 75%.[25]
Overcrowding
First Capital Connect was criticised for running some of the country's most overcrowded trains; the 07.15 from Cambridge to London King's Cross frequently was reported to have had 76 people standing for every 100 seated.[26] This situation was recognised by FCC itself: "We recognise that overcrowding is the biggest issue affecting our customers. This is at an unacceptable level on some of our services".[27] From 27 May 2009 FCC introduced extra carriages, which meant that this service became a 12-car train rather than an 8-car. In early 2013, Which magazine carried out a survey which rated First Capital Connect as the worst train operator.
Pricing
Fares
In mid-2006, First Capital Connect introduced evening peak-time fares for northbound travel out of London as a franchise commitment with the Department for Transport. Previously passengers with an off-peak travelcard could travel on any train after the morning peak had finished at 09:30. Now passengers may no longer use an off-peak ticket for trains leaving London stations between 16:30 and 19:00. Passengers using these peak-hour trains must pay an additional charge to travel. The evening peak restriction does not affect southbound travel. This was introduced due to severe peak-time overcrowding.[28]
Students at some sixth-form colleges were hit by price increases of over £300 per annum when FCC replaced a discount scheme introduced by previous franchise holders WAGN and Thameslink, with its own 'Student Connect'[29] scheme. The level of discount was greatly reduced, and although in theory the scheme is fairer, in practice many students and parents were left out of pocket.[30]
Incidents
In September 2010, First Capital Connect admitted in an email that, despite being trained in first aid, staff were not allowed to offer medical help to members of the public. An incident was reported by the BBC after a passenger collapsed and FCC's station staff would not help.[31]
In October 2010, passengers trapped on a failed train near Cambridge gave up waiting, forced the train doors open and walked up the line to the nearby Foxton station.[32]
On 26 May 2011 at 18:27, passengers were trapped on a failed Class 377 train between St Pancras International (Low Level) and Kentish Town stations, forming the 16:30 Brighton to Bedford service. Another train of the same type was sent to assist the failed train, and was eventually coupled to it at 20:20 but by this time passengers had used the emergency release handles to open the train doors in an attempt to improve ventilation (as the air-conditioning and lighting systems were no longer functioning by this point). The train began to move at 21:03 but this movement was immediately stopped because passengers were getting out on to the railway from the carriages within the tunnel. The passengers were escorted back on to the train, which was authorised to move forward again at 21:12. Three sets of doors towards the rear of the train were still fully open whilst it traveled approximately a mile to Kentish Town, where all passengers then left the train.[33] First Capital Connect admitted a number of failings in the way in which it handled this incident, including a need to improve communications with passengers.[34]
Rolling stock
First Capital Connect inherited a fleet of Class 319 units from the former Thameslink operator. It also inherited a fleet of Class 313, 317 and 365 units from WAGN on the Great Northern routes.
Final rolling stock
The rolling stock composition is specified by the franchise agreement.[35]
Class | Image | Type | Top speed | Number | Routes operated | Built | |
---|---|---|---|---|---|---|---|
mph | km/h | ||||||
Class 03 | diesel locomotive | 28 | 46 | 1 | Shunting | 1957–1961 | |
Class 313 | EMU | 75 | 120 | 44 | Inner suburban Great Northern (Moorgate - Letchworth Garden City/Hertford North/Welwyn Garden City) |
1976–1977 | |
Class 317/1 | 100 | 160 | 12 | Fast & Semi Fast Great Northern London to Peterborough & Cambridge | 1981–1982 | ||
Class 317/7 | 100 | 160 | 2 | Used to provide cover for Class 365 units undergoing refurbishment. Withdrawn at end of franchise. |
1981–1982 | ||
Class 319 | 100 | 160 | 84 | Thameslink (Brighton - Bedford, Sutton - Luton and Kentish Town - Sevenoaks) |
1987–1988 1990 | ||
Class 321 | 100 | 160 | 13 | Fast & Semi Fast Great Northern London to Peterborough & Cambridge | 1989–1990 | ||
Class 365 | 100 | 160 | 40 | Fast & Semi Fast Great Northern London to Peterborough & King's Lynn via Cambridge | 1994–1995 | ||
Class 377/2 Electrostar | 100 | 160 | Thameslink (Brighton - Bedford and peak services: Bedford - Ashford International/Rochester) Sub-leased from Southern. |
2003–2004 | |||
Class 377/5 Electrostar | 100 | 160 | 23 | 2008–2009 |
All Thameslink route rolling stock was electrically powered dual-voltage four-car units using 25 kV AC overhead power north of Farringdon and 750 V DC third rail to the south.
In addition to its EMU fleet, FCC owned the last mainline-registered Class 03 diesel shunter, 03179 Clive.
Additional rolling stock
An additional four Class 319s were transferred from Southern in March 2009 to expand capacity on the Thameslink route, giving FCC all 86 319s. The DfT ordered 23 new dual-voltage Class 377 units for Southern, which entered service in 2010 and were sublet to FCC until the new Thameslink rolling stock is introduced, to further enhance capacity on the Thameslink services.[36] FCC also gained 13 Class 321s from London Midland: 321401-406 in May 2009, 321407-410 later in 2009, 321418-420 in 2010. These enhanced the capacity on Peterborough / Cambridge - King's Cross services. Three Class 313 units from London Overground moved to the Great Northern route for inner-suburban services, King's Cross/Moorgate - Welwyn Garden City/Hertford North/Letchworth Garden City, once all of London Overground's new Class 378 were delivered.
Diagrams
Depots
FCC operated two depots:
- Bedford Cauldwell - code BF
- Hornsey - code HE
Refurbishment
During its tenure, FCC overhauled all of its rolling stock painting their exteriors in the FCC livery and refreshing the interiors.[37] It had an £8 million programme of upgrades for several major stations.[38]
See also
References
- ↑ Companies House extract company no 5281077 First Capital Connect Limited
- ↑ "Pre-qualified Bidders for Two New Passenger Franchises were announced by the SRA today" (Press release). Strategic Rail Authority. 1 April 2005. Archived from the original on 7 April 2005.
- ↑ "Department for Transport Announces Winner of Thameslink/GN Franchise" (Press release). Department for Transport. 13 December 2005. Archived from the original on 10 March 2007.
- ↑ "DfT announces winner of Greater Western and Thameslink/GN franchises". Department for Transport. 13 December 2005. Retrieved 24 July 2007.
- ↑ "Statement re Rail Franchises" (Press release). FirstGroup. 5 August 2011. Retrieved 4 December 2011.
- ↑ "Thameslink Programme". First Capital Connect. Retrieved 19 March 2012.
- ↑ "The £3.5bn Thameslink project clears major hurdle" (Press release). Network Rail. 18 October 2006. Archived from the original on 4 March 2007. Retrieved 10 November 2006.
- ↑ "Cambridge Capacity Study". First Capital Connect. 17 December 2007. Archived from the original on 17 December 2007.
- ↑ "Key changes to evening peak services" (PDF). First Capital Connect. 2007. Archived from the original (PDF) on 29 February 2008.
- ↑ "Thameslink franchise 2013". Department for Transport. 19 December 2011.
- ↑ "Thameslink Franchise OJEU Notice" (PDF). Department for Transport. 19 December 2011. Retrieved 28 December 2011.
- ↑ "Bidders to oversee improvements on rail franchises announced" (Press release). Department for Transport. 29 March 2012.
- ↑ "West Coast Main Line franchise competition cancelled" (Press release). Department for Transport. 3 October 2012.
- ↑ Rail franchising future programme Department for Transport 31 January 2013
- ↑ "Railway plan puts new focus on passengers" Secretary of State for Transport statement 26 March 2013
- ↑ "Passengers on track to receive multi-billion pound improvements to services" (Press release). Department for Transport. 18 February 2014.
- ↑ "New rail franchising deal set to transform passenger services across London and south east" (Press release). Department for Transport. 23 May 2014. Retrieved 23 May 2014.
- ↑ Weaver, Matt (13 November 2009). "More chaos for commuters as train driver shortages continue". The Guardian. London. Retrieved 7 January 2010.
- ↑ "Train services hit by snow damage". BBC News. 11 January 2010. Retrieved 2 May 2010.
- ↑ "'Near normal' service on trains". BBC News. 18 January 2010. Retrieved 2 May 2010.
- ↑ "Disruption FAQ". First Capital Connect. 24 January 2009. Archived from the original on 23 January 2010. Retrieved 24 January 2010.
- ↑ McVeigh, Tracy (24 January 2009). "Commuters petition Gordon Brown to strip First Capital Connect of franchise on Thameslink 'misery line'". The Guardian. London. Retrieved 24 January 2010.
- ↑ "Adonis criticises First Capital Connect rail services". BBC News. 15 January 2010. Retrieved 20 January 2010.
- ↑ Pickard, Jim; Plimmer, Gill (21 January 2010). "Adonis warns Thameslink rail operator". Financial Times. London. Retrieved 24 January 2010.
- ↑ "National Passenger Survey Autumn 2009". Passenger Focus. 4 February 2010. Retrieved 13 May 2010.
- ↑ Tibbetts, Graham (15 October 2008). "Government cuts train overcrowding with new definition". The Daily Telegraph. London. Retrieved 23 February 2009.
- ↑ "Overcrowded trains are 'shaming Britain'". London Evening Standard. 26 March 2007. Retrieved 23 February 2009.
- ↑ "Off Peak Ticket Restrictions". First Capital Connect. Retrieved 14 March 2010.
- ↑ FCC Student Connect website
- ↑ Morris, Laura (26 August 2008). "Rail users hit by 170% fares rise". Cambridge News.
- ↑ "First Capital Connect staff 'cannot give medical help'". BBC News. 21 September 2010.
- ↑ "Passengers break out of stuck train in Cambridgeshire". BBC News. 29 October 2010.
- ↑ "Investigation into an incident near London St Pancras International (Low Level), 26 May 2011". RAIB. 7 November 2011.
- ↑ "Report into major disruption on 26 May 2011" (Press release). First Capital Connect. 19 July 2011.
- ↑ "Agreement between the Secretary of State for Transport and First Capital Connect Limited" (PDF). Department for Transport. Retrieved December 2012. Check date values in:
|access-date=
(help) - ↑ Rolling Stock Plan - Indicative Number of Additional Vehicles required by English TOCs by 2014
- ↑ FCC. "We're Improving".
- ↑ RailStaff (6 April 2006). "First Capital Connect links London". Retrieved 10 April 2006.
External links
Media related to First Capital Connect at Wikimedia Commons
Preceded by Thameslink Thameslink franchise |
Operator of Thameslink Great Northern franchise 2006 – 2014 |
Succeeded by Thameslink and Great Northern (Govia Thameslink Railway) Thameslink Southern & Great Northern franchise |
Preceded by West Anglia Great Northern West Anglia Great Northern franchise |