MetroNorth Corridor

MetroNorth Corridor
Overview
Type Light rail
System St. Louis MetroLink
Locale Greater St. Louis
Operation
Operator(s) Bi-State Development Agency
Technical
Line length 10–12 miles (16–19 km)
Track gauge 1,435 mm (4 ft 8 12 in)

The MetroNorth Corridor is a proposed light rail alignment for the St. Louis MetroLink light rail system in St. Louis, Missouri, United States.

Proposed route

The alignment is part of the Daniel Boone Corridor and the Blue Line that connects from Clayton, St. Louis County's central business district to Florissant, Hazelwood, Ferguson, and Berkeley in North County.


This article is issued from Wikipedia - version of the 10/10/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.