Yizhuang Line, Beijing Subway
Yizhuang Line, Beijing Subway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Beijing Subway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
Songjiazhuang Yizhuang Railway Station | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 14 (13 in operation) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership |
173,500 (2014 Avg.) 221,200 (2014 Peak)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 28 December 2010 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Beijing Mass Transit Railway Operation Corp., Ltd | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 23.23 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 km/h (maximum service speed) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Yizhuang Line of the Beijing Subway (Chinese: 北京地铁亦庄线; pinyin: běijīng dìtiě yìzhuāng xiàn), formerly designated Line L2, is a rapid transit line that connects the Yizhuang Industrial Park with Beijing's subway network. The line is 23.23 kilometres (14.43 mi) long with 14 stations, including six underground and eight on the surface.[2] It runs from Songjiazhuang, the current southern terminus of Line 5, Beijing Subway in Fengtai District to the Yizhuang Railway Station in Tongzhou District and passes through the southern Chaoyang and northern Daxing Districts.[3] Total investment for the line was estimated at ¥1.2 billion.[2] Construction began on December 8, 2007 and the line opened on December 30, 2010.[2]
Route
Stations listed from north to south:[3]
- Yizhuang Railway Station did not open in 2010 as the train station itself was not yet operational. Until the railway station opens, passengers can travel only as far as Ciqu, even though the actual subway train has to continue to the terminus to reverse.
English |
Hanzi |
|
|
|
Songjiazhuang | 宋家庄 | 5 10 | 17 39 366 511 524 576 650 684 990 特11 夜28 | Fengtai |
Xiaocun | 肖村 | 25 93 128 602 623 665 680 740 820 821 985 990 特9 夜23 | Chaoyang | |
Xiaohongmen | 小红门 | 352 985 | ||
Jiugong | 旧宫 | 324 555 599 825 926 927 953 997 运通115 专25 | Daxing | |
Yizhuangqiao | 亦庄桥 | 324 599 623 652 665 821 826 846 927 997 运通115 运通202 | ||
Yizhuang Culture Park | 亦庄文化园 | |||
Wanyuanjie | 万源街 | 324 623 652 821 927 975 976 运通202 | ||
Rongjingdongjie | 荣京东街 | 523 652 665 846 运通202 | ||
Rongchangdongjie | 荣昌东街 | 324 453 542 578 580 623 652 665 846 专41 专96 | ||
Tongjinanlu | 同济南路 | 542 821 846 927 975 976 专41 专96 | Tongzhou | |
Jinghailu | 经海路 | 523 | ||
Ciqu South | 次渠南 | |||
Ciqu | 次渠 | 637 820 986 | ||
Yizhuang Railway Station | 亦庄火车站 | |||
Notes
- ↑ "2014年4月30日综合交通总体运行情况". 北京市交通信息中心 北京市交通运行监测调度中心. 2014-05-01. Retrieved 2014-05-02.
- 1 2 3 (Chinese) 北京地铁亦庄线望2010年建成 全长23.23公里 Xinhua Dec. 12, 2008
- 1 2 (Chinese) Yizhuang Line Information Page BII